AIB Soffit at Wardown Museum, Luton
SCOPE:Removal of AIB soffit to facilitate roof repairs
Share
This project was the removal of 40 linear metres of AIB soffits under fully controlled asbestos conditions to facilitate much needed roof repairs to the Museum.
The work was carried out in two asbestos proof enclosures and was completed with a 6 man site team in four days.
We handed the building back to our Client a day ahead of programme.